Why everyone pads their estimates Decide in the open, episode 16 Anna: Welcome to Decide in the open. Today we're looking at why everyone pads their estimates. It's often dismissed as poor planning, but game theory explains why padding estimates is a sensible response to how organisations treat estimates. Tom: From the outside, padding looks like teams just hiding slack so they don't get caught out. Anna: It's an equilibrium response to asymmetric penalties. Look at the game each team lead faces when they're asked how long their piece of work will take. If they come in late, there's an awkward conversation. But if they come in early, nothing happens, or the saved time vanishes into the next request. Tom: So being late carries a real cost, while coming in early brings nothing. Anna: There's no upside at all. If coming in early gives you nothing, and coming in late brings an awkward conversation, the rational move is to add a buffer. You protect yourself against that asymmetric penalty. But the problem spreads when every team does the same. Tom: Every team adds their own buffer to their own piece of work. Anna: They do. The plan now contains several buffers stacked on top of each other. Planning absorbs that combined buffer, and work tends to expand to fill the time available. In the end, the project takes longer than if everyone had given honest estimates and shared one buffer. Tom: So leaders try lecturing. They tell teams to stop padding and be realistic. Anna: And lecturing doesn't work. Telling people to stop padding asks them to accept personal risk for a shared benefit. Nobody wants to go first. If you drop your buffer while others keep theirs, you take on personal risk. The behaviour comes from the incentives, so the incentives are what need to change. Tom: Exhortation won't change the game. What actually changes the behaviour? Anna: You fix the incentives directly. First, pool the contingency. Instead of every team hiding their own buffer, you ask for honest estimates and hold one shared buffer at project level, owned by the sponsor. Teams draw on it openly when they need it. Tom: That means the buffer is transparent, but teams still have to estimate their work. Anna: They do, but you change what you ask for. You use reference-class estimation and ask for ranges instead of single dates. 'Four to seven weeks, 80% confident' is more honest than 'six weeks', and it can be checked for calibration. Tom: Most organisations push for a single deadline like six weeks because ranges feel uncertain. Anna: A single deadline is just false certainty. A range can actually be checked for calibration. That connects to the third fix: reward accuracy, not punctuality. Organisations need records that reward calibration over punctuality by tracking estimates against actuals over time. Tom: You track who is actually accurate over time rather than who hits a padded date. Anna: Exactly. The people whose ranges are reliable are the ones to trust with bigger plans. That stops planning from absorbing stacked buffers and removes the awkward conversation for honest uncertainty. Tom: It aligns the incentives so nobody has to take personal risk just to give an honest estimate. Anna: It changes the game entirely. Which repeated decision would you trust a cheap model to score first, with a person checking the close calls? Tom: You can read the full page, and the rest of the site, at craigstanley.work.